Interface hook-up data sheet for Heidrun

Norsok Standard Z-015

General information

Plant type: Fast innretning

Electrical

Power *
Volt [V]
Frequency [Hz]
Phase Current [A]
Neutral Loaded [Yes/No]
System earth **
Short circuit level min [kA]
Short circuit level max [kA]
Distribution protection fuse [A]
Distribution protection earth fault [mA]
Connection platform (Description / Type)
Connection temporary equipment (Description / Type)
Area (Module Number / Room Number)
Main690
3p+e
5063NoS5063Socket:
STAHL
8579\11-405
(black) 5h
Plug:
STAHL
8579\12-405
(black) 5h
Welding socket outlets all over the plattform
Emg690
3p+e
50125NoI50125Socket:
STAHL
8581\11-405
(black) 5h
Plug:
STAHL
8581\12-405
(black) 5h
4 socket outlets for wireline operations at D10 pipedeck
Main400
3P+N+e
5063NoS106330Socket:
GHG 534 0002 R0126 6h
Plug:
GHG 534 2506 V0 6h
This type of socket is only available at dedicated utility stations for temporary equipment.
Emg400
3P+N+e
5063NoS106330Socket:
GHG 534 0002 R0126 6h
Plug:
GHG 534 2506 V0 6h
This type of socket is only available at dedicated utility stations for temporary equipment.
Main230
2p+e
5016YesS101630Socket:
STAHL
8575\11-306
(black) 6h
Plug:
STAHL
8575\12-306
(black) 6h
Outlets all over the plattform
Emg690
3p+e
5063NoI5063Socket:
STAHL
8579\11-405
(black) 5h
Plug:
STAHL
8579\12-405
(black) 5h
4 socket outlets for wireline operations at D10 pipedeck
Main690
3p+e
50NoSSACE
1250A
Junction box H11, H21, H31,H41Junction boxes at weaterdeck of each coloumn H10, H20, H30 and H40. For tether adjustment tools. Supply cables 3x95/50 from swbd. in hull.

*
Main - Main Power,
Emg - Emergency Power,
Ess - Essential Power,
UPS - UPS Power

**
S = Solidly (direkte jordet),
I = Isolated (isolert)
R = Resistor (resistansjordet)

Instrument

Function
Signal type
Connection platform (Description / Type)
Connection temporary equipment (Description / Type)
Area (Module Number / Room Number)
Loss Of PressureNO-kontakt (kontakt=alarm)
2 K ohm i paralell
Socket:
GHG 591 1201 R0002 6h
Pin 7,8
Plug:
GHG 591 2201 R 0002 6h Pin 7,8,9
20meteres RFOU kabel connected
FireNO-kontakt (kontakt=alarm)Socket
GHG 591 1201 R0002 6h
Pin 1,2
Plug:
GHG 591 2201 R 0002 6h Pin 1,2,3 20meteres RFOU kabel connected
GasNO-kontakt (kontakt=alarm)Socket
GHG 591 1201 R0002 6h
Pin 4,5
Plug:
GHG 591 2201 R 0002 6h Pin 4,5,6 20meteres RFOU kabel connected
OtherNO-kontakt (kontakt=alarm)Socket
GHG 591 1201 R0002 6h
Pin 10,11
Plug:
GHG 591 2201 R 0002 6h Pin 10,11,12
20meteres RFOU kabel connected
ESD Battery System

Telecom

Function
Signal type
Connection platform (Description / Type)
Connection temporary equipment (Description / Type)
Area (Module Number / Room Number)
PASocket:
STAHL 8575\11-404 4h (yellow)
Plug:
STAHL 8575/12-404 4h (yellow)
D16
TelephoneSocket:
STAHL 8575\11-402 2h (green)
Plug:
STAHL 8575/12-402 2h (green)
D16

Utilities

Function
Pressure [bar]
Amount/Flow [max capacity]
Connection - type
Connection - diameter
Connection - material
Area (Module Number / Room Number)
Plant Air
Instrument Air
Seawater
Other
Sprinkler
Freshwater
Drain

Lifting capacity offshore cranes

Crane
1 meter *
2 meter *
3 meter *
Kran syd trippel part48 tonn/ 21 meter37,5 tonn/ 21 meter28,8 tonn/ 21 meter
Kran øst/vest dobbel part32 tonn/ 31,3 meter 29,1 tonn/ 31,3 meter22,9 tonn/ 31,3 meter
Kran øst/vest trippel part48 tonn/ 21 meter37 tonn/ 21 meter28,2 tonn/ 21 meter
Kran syd dobbel part32 tonn/ 31,3 meter28,7 tonn/ 31,3 meter22,6 tonn/ 31,3 meter

* Significant waveheight [max. load / max. radius]

Comments

I TABELLEN VISES MAKS. LØFTEKAPASITET FOR LØFT MED STORBLOKK FRA FORSYNINGSSKIP (tonn) I FORHOLD TIL SIGNIFIKANT BØLGEHØYDE (meter).

Additional information

Eksempel på framføring av instrumentsignal i kontainer på Heidrun. Alternative løsninger aksepteres, men signalkontakter og motstander skal være tilkoplet pinnene i støpselet slik som vist. NB !! Alle fire motstandene skal inn selv om signalet ikke er i bruk. Dette for å unngå alarm i kontrollrom.