Interface hook-up data sheet for Scarabeo 5

Norsok Standard Z-015

General information

Plant type: Flyttbar innretning

Electrical

Power *
Volt [V]
Frequency [Hz]
Phase Current [A]
Neutral Loaded [Yes/No]
System earth **
Short circuit level min [kA]
Short circuit level max [kA]
Distribution protection fuse [A]
Distribution protection earth fault [mA]
Connection platform (Description / Type)
Connection temporary equipment (Description / Type)
Area (Module Number / Room Number)
Main440 3p+e6063Socket CEAG GHG 514 4407 R0001Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
Main440 3p+e6063JB CEAG GHG 7210Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
Main440 3p+e6032Socket CEAG GHG 512 4407 R0001 Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
Main440 3p+e60125CB Below Aft Catwalk Terminal 3 Upp Dk Aft
Main220 3p+e6016Terminal Box CEAG GHG 791 0101 R0001Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
Main440 3p+e60125JB Telemetry RoomTerminal 4 Upp Dk Stbd
Main220 2p+e6016Socket CEAG GHG 511 4306 R0001Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd

*
Main - Main Power,
Emg - Emergency Power,
Ess - Essential Power,
UPS - UPS Power

**
S = Solidly (direkte jordet),
I = Isolated (isolert)
R = Resistor (resistansjordet)

Instrument

Function
Signal type
Connection platform (Description / Type)
Connection temporary equipment (Description / Type)
Area (Module Number / Room Number)
Loss Of PressureN.OTerminal Box CEAG GHG 746 (X1 9/10)Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
OtherN.OSystem Fault: Terminal Box CEAG GHG 746 (X1 5/6)
Manual Alarm: Terminal Box CEAG GHG 746 ( X1 7/8)
Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
ESD Battery SystemN.CTerminal Box CEAG GHG 746 (X1 11/12)Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
FireN.OTerminal Box CEAG GHG 746 (X1 3/4)Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
GasN.OTerminal Box CEAG GHG 746 (X1 1/2)Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd

Telecom

Function
Signal type
Connection platform (Description / Type)
Connection temporary equipment (Description / Type)
Area (Module Number / Room Number)
General alarm24VDCTerminal Box JB Heavy Tool Store/Terminal Box JB oceaneering /Terminal Box JB ECR /Terminal Box JB Telemetry RoomTerminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
PA100VTerminal Box CEAH GHAG 721 0 (A3 1/2)Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
TelephoneAnalogueTerminal Box CEAH GHAG 721 0 (A4 1/2)Terminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd
DataDigitalTerminal Box CEAG GHG 1220000 22256 RIO ModulesTerminal 1 Pipedeck fwd/Terminal 2 Upp Dk Pt/Terminal 3 Upp Dk Aft/Terminal 4 Upp Dk Stbd

Utilities

Function
Pressure [bar]
Amount/Flow [max capacity]
Connection - type
Connection - diameter
Connection - material
Area (Module Number / Room Number)
Plant Air9
Sprinkler
Freshwater
Drain
Instrument AirN/A
Seawater
Other

Lifting capacity offshore cranes

Crane
1 meter *
2 meter *
3 meter *
Main hoist 2 parts*see load chartsee load chartsee load chart
Whip hoist*see load chartsee load chartsee load chart
Main hoist 3 parts*see load chartsee load chartsee load chart
Main hoist 4 parts*see load chartsee load chartsee load chart

* Significant waveheight [max. load / max. radius]

Comments

Instrument:
Common for all connection: cable from container to junction box
Common for Hook Up to platform: Potential free Contact to CCR

Telecom:
Hook Up to platform: 1) PA Distributed 100 V PA system
2) Telephone: Std. telephone line
Common for PA and Telephone connection: cable from container to junction box

Additional information

*see attached load charts:

Figur 1.7.4 Dynamic load chart, Main hoist 2 parts



Figur 1.7.3 Dynamic load chart, Main hoist 2 parts


Figur 1.7.2 Dynamic load chart, Main hoist 3 parts


Figur 1.7.1 Dynamic load chart, Main hoist 4 parts